Loans
Who has what, and when it's due back. Returned loans stay on record.
| Equipment | Who | For | Out | Due | Status | |
|---|---|---|---|---|---|---|
| Rotary tool | Ken WatanabeMaintenance | Preventive maintenance round | Nov 9 | Nov 126 days ago | 6 days late | |
| Lockout kit | Aisha KarimEngineering | Line 2 changeover | Nov 12 | Nov 135 days ago | 5 days late | |
| Heat gun | Victor HaleFacilities | Office move, second floor | Nov 12 | Nov 162 days ago | 2 days late | |
| Thermal camera | Aisha KarimEngineering | Motor heat check, press 6 | Nov 10 | Nov 17yesterday | 1 day late | |
| Impact driver | Nadia PetrovaEngineering | Process study, deburring | Nov 16 | Nov 17yesterday | 1 day late | |
| Fall-protection harness | Tom BeckerMaintenance | Roof unit inspection | Nov 18 | Nov 18today | Due today | |
| Oscilloscope, 100 MHz | Aisha KarimEngineering | PLC signal trace, press 6 | Nov 13 | Nov 19tomorrow | On loan | |
| Digital caliper, 150 mm | Lena HoffmannQuality | Incoming inspection | Nov 18 | Nov 19tomorrow | On loan | |
| Label printer | Owen ClarkeProduction | Changeover, line 4 | Nov 13 | Nov 20in 2 days | On loan | |
| Thermal camera | Ken WatanabeMaintenance | Panel survey, line 4 | Nov 16 | Nov 20in 2 days | On loan | |
| Outside micrometer, 0-25 mm | Priya RamanEngineering | Process study, deburring | Nov 16 | Nov 23in 5 days | On loan | |
| HMI touch panel | Victor HaleFacilities | Safety walk | Nov 17 | Nov 23in 5 days | On loan | |
| Digital multimeter | Lena HoffmannQuality | First-article inspection | Nov 18 | Nov 24in 6 days | On loan | |
| Barcode scanner | Marcus BellProduction | Line 2 setup | Nov 4 | Nov 25in 7 days | On loan | |
| Laptop, 14 inch | Priya RamanEngineering | Customer first-article run | Nov 12 | Nov 26in 8 days | On loan | |
| Laptop, 14 inch | Nadia PetrovaEngineering | Process study, deburring | Nov 17 | Dec 1in 13 days | On loan | |
| Laptop, 14 inch | Grace LiuIT | New hire laptop setup | Nov 2 | Dec 4in 16 days | On loan |